40 Pin Kreisförmiges TFT-LCD-Bildschirm 360x360 RGH 3.6 Zoll ST72566

Rundes LCD-Display
April 03, 2025
Category Connection: Rundes LCD-Display
Brief: Entdecken Sie das 40-Pin-Kreislauf-TFT-LCD-Display 360x360 RGH 3.6 Zoll ST72566, ein leistungsstarkes Display mit lebendigem Bild und hervorragender Sichtbarkeit.und Unterhaltungselektronik, bietet dieses Display eine Auflösung von 360x360, 1000cd/m2 Helligkeit und eine RGB-Schnittstelle für eine nahtlose Integration.
Related Product Features:
  • 3.6-inch circular TFT LCD display with a resolution of 360x360 for clear and vibrant visuals.
  • Driven by ST72566 IC, ensuring efficient performance and reliability.
  • High brightness of 1000cd/m² and contrast ratio of 1200:1 for excellent visibility in bright conditions.
  • RGB interface for efficient communication with external components.
  • Supports an operating voltage range of 3.0V to 3.6V with a quick response time of 30ms.
  • ALL o'clock viewing direction for optimal visibility from any angle.
  • Operates in a wide temperature range from -30°C to 80°C, ensuring reliability in diverse environments.
  • Compact dimensions of 98.88mm (H) x 94.12mm (V) x 7.70mm (T) with an active viewing area of 89.76mm (H) x 83.49mm (V).
FAQs:
  • What is the resolution of the 3.6-inch circular TFT LCD display?
    The display offers a resolution of 360x360, providing clear and vibrant visuals.
  • What is the brightness level of this LCD display?
    The display has a high brightness of 1000cd/m², ensuring excellent visibility even in bright ambient conditions.
  • What is the operating temperature range for this display?
    The display operates in a wide temperature range from -30°C to 80°C, making it reliable in diverse environmental conditions.
  • Does this display support custom logos?
    Yes, custom logos are supported. Please send your detailed inquiry, and our sales team will contact you promptly.
  • What is the lead time for sample orders?
    Sample orders typically take 3~5 days if the goods are in stock, while mass production may take 3~5 weeks depending on the quantity and product.